28 /July 2020

Bridge in Polotsk

According to the results of exchange trades,  PROTOS plant was recognized as a supplier of steel structures for the superstructure for the Bridge across the river Zapadnaya Dvina on the Yubileinaya street in Polotsk ".

In the period from 07/02/2020 to 07/28/2020 the PROTOS plant manufactured and delivered the entire volume of products, the total volume of which is 549, 35 tons.

PROTOS LLC duly fulfilled all obligations to the Customer: products manufactured in the Republic of Belarus were delivered on time, according to the established order of delivery, complete, metal structures were accepted for quality by the Bridge Inspectorate.