Object: bridge over the Zapadnaya Dvina river, metal span L = 72m
Consumer: MOSTOSTROY OJSC.
Engineering company: Ekomost LLC
Metal manufacturer: Protos LLC
The bridge across the Zapadnaya Dvina in Polotsk was built in 1934; during the war, bridge was partially destroyed; and in 1965, it was rebuilt.

The movement of pedestrians and vehicles due to the beginning of major repairs was closed on October 8, 2019. The standard construction period, according to the project, is 14 months.




